Sponsored by:
Assemblyman ALEX SAUICKIE
District 12 (Burlington, Middlesex, Monmouth and Ocean)
SYNOPSIS
Extends for five years date of certain greenhouse gas emissions and clean energy goals.
CURRENT VERSION OF TEXT
As introduced.
An Act concerning the date of certain greenhouse gas emissions and clean energy goals, and amending various parts of the statutory law.
Be It Enacted by the Senate and General Assembly of the State of New Jersey:
1. Section 2 of P.L.2007, c.112 (C.26:2C-38) is amended to read as follows:
2. The Legislature finds and declares that, internationally, the issue of global warming has caused alarm, awareness, and action concerning climate changes occurring around the globe attributed to the high level of certain gases called "greenhouse gases" - gases that increase temperatures in the atmosphere and the risk of catastrophic changes to the Earth's ecosystems and environment; that, while this global warming may be a theory to some, the effects of increasing levels of greenhouse gases in the atmosphere are accepted by all respected scientists and the vast majority of the international community as seriously detrimental to the ecosystems and environment of the world; that, ultimately, if steps are not taken to reverse these trends, the effects on human, animal and plant life on Earth may be catastrophic; that solutions exist to halt the increasing of greenhouse gases in the atmosphere and reduce these emissions; that, as a global issue, each country and region within a country must do its part to reduce these greenhouse gases that threaten the globe; and that, as a State, there are specific actions that can be taken to attack the problem of global warming, through reductions of greenhouse gas emissions in the State and participation in regional and interstate initiatives to reduce these emissions regionally, nationally, and internationally.
The Legislature further finds and declares that, while carbon dioxide is the primary and most abundant greenhouse gas, other greenhouse gases known as short-lived climate pollutants, including black carbon, fluorinated gases, and methane, create a warming influence on the climate that is many times more potent over a shorter period of time than that of carbon dioxide, and have a dramatic and detrimental effect on air quality, public health, and climate change; and that reducing emissions of these pollutants can have an immediate beneficial impact on climate change and public health.
The Legislature therefore finds and declares that it is in the public interest to establish a greenhouse gas emissions reduction program that includes a comprehensive strategy to reduce short-lived climate pollutants and to limit the level of Statewide greenhouse gas emissions, and greenhouse gas emissions from electricity generated outside the State but consumed in the State, to the 1990 level or below, of those emissions by the year 2020, and to reduce those emissions to 80 percent below the 2006 level by the year [2050] 2055 .
(cf: P.L.2019, c.197, s.1.)
2. Section 3 of P.L.2007, c.112 (C.26:2C-39) is amended to read as follows:
3. For the purposes of P.L.2007, c.112 (C.26:2C-37 et al.):
"Department" means the Department of Environmental Protection.
"Greenhouse gas" means carbon dioxide, methane, nitrous oxide, hydrofluorocarbons, perfluorocarbons, sulfur hexafluoride, and any other gas or substance determined by the Department of Environmental Protection to be a significant contributor to the problem of global warming.
"Statewide greenhouse gas emissions" means the sum of calendar year emissions of greenhouse gases from all sources within the State, and from electricity generated outside the State but consumed in the State, as determined by the department pursuant to subsection c. of section 5 of P.L.2007, c.112 (C.26:2C-41).
"2020 limit" means the level of greenhouse gas emissions equal to the 1990 level of Statewide greenhouse gas emissions.
"[2050] 2055 limit" means the level of greenhouse gas emissions equal to 80 percent less than the 2006 level of Statewide greenhouse gas emissions.
(cf: P.L.2019, c.197, s.2.)
3. Section 4 of P.L.2007, c.112 (C.26:2C-40) is amended to read as follows:
4. a. No later than January 1, 2020, the level of Statewide greenhouse gas emissions shall be reduced to, or below, the 2020 limit. No later than January 1, [2050] 2055 , the greenhouse gas emissions in the State shall be stabilized at or below the [2050] 2055 limit and shall not exceed that level thereafter. The department shall consider the economic impact upon the State and upon the emitters of a greenhouse gas for any measure imposed to meet the 2020 limit and the [2050] 2055 limit.
b. No later than one year after the date of enactment of this act, the department shall establish:
(1) an inventory of the current and 2006 Statewide greenhouse gas emissions; and
(2) an inventory of the 1990 level of Statewide greenhouse gas emissions.
(cf: P.L.2007, c.112, s.4.)
4. Section 5 of P.L.2007, c.112 (C.26:2C-41) is amended to read as follows:
5. a. No later than 18 months after the effective date of P.L.2019, c.197, the department shall adopt, pursuant to the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), rules and regulations establishing a greenhouse gas emissions monitoring and reporting program to monitor and report Statewide greenhouse gas emissions.
b. The rules and regulations adopted pursuant to subsection a. of this section shall identify all significant sources of Statewide greenhouse gas emissions including short-lived climate pollutants, and shall provide for, but need not be limited to, the following:
(1) monitoring and reporting of existing emissions and changes in emissions over time from the sources identified by the department;
(2) reporting the levels of those emissions and changes in those emissions levels annually, commencing 18 months after the effective date of P.L.2019, c.197; and
(3) monitoring progress toward the 2020 limit and the [2050] 2055 limit and any interim limits.
c. Pursuant to the rules and regulations adopted pursuant to subsection a. of this section, the department shall require reporting of the greenhouse gas emissions:
(1) associated with fossil fuels used in the State, as reported by entities that are manufacturers and distributors of fossil fuels, which may include, but need not be limited to, oil refineries, oil storage facilities, natural gas pipelines, and fuel wholesale and retail distributors;
(2) from any entity generating electricity in the State and from any entity that generates electricity outside the State that is delivered for end use in the State. With respect to electricity generated outside the State and imported into the State, the department shall determine the emissions from that generation by subtracting the kilowatt-hours of electricity generated in the State from the kilowatt-hours of electricity consumed in the State, and multiplying the difference by a default emissions rate determined by the department;
(3) from any gas public utility as defined in section 3 of P.L.1999, c.23 (C.48:3-51); and
(4) from any additional entities that are significant emitters of greenhouse gases, as determined by the department, and as appropriate to enable the department to monitor compliance with progress toward the 2020 limit and the [2050] 2055 limit.
d. No later than 18 months after the department prepares and transmits the report as required pursuant to subsection c. of section 6 of P.L.2007, c.112 (C.26:2C-42), the department shall adopt, pursuant to the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), rules and regulations establishing interim benchmarks necessary to achieve the [2050] 2055 limit, and measures necessary to achieve the [2050] 2055 limit and the established interim benchmarks.
(cf: P.L.2019, c.197, s.3.)
5. Section 6 of P.L.2007, c.112 (C.26:2C-42) is amended to read as follows:
6. a. The department, in consultation with the Board of Public Utilities, the Department of Agriculture, the Department of Transportation, and the Department of Community Affairs, shall evaluate policies and measures that will enable the State to achieve the 2020 limit, shall make specific recommendations on how to achieve the emission reduction targets, including measures that reduce emissions in all sectors of the economy including transportation, housing, and consumer products, and shall evaluate the economic benefits and costs of implementing these recommendations. The department shall coordinate its evaluation of greenhouse gas emission reduction policies and measures with the work of the Energy Master Plan Committee established pursuant to section 12 of P.L.1977, c.146 (C.52:27F-14).
b. No later than June 30, 2008, the department, and any other State agencies, as appropriate, shall prepare a report recommending the measures necessary to reduce greenhouse gas emissions to achieve the 2020 limit. The report shall include specific recommendations for legislative and regulatory action that will be necessary to achieve the 2020 limit. The report shall be transmitted to the Governor, to the State Treasurer, to the Legislature pursuant to section 2 of P.L.1991, c.164 (C.52:14-19.1) and to the members of the Senate Environment Committee and the Assembly Environment and Solid Waste Committee.
c. No later than one year after the effective date of P.L.2019, c.197, the department, in consultation with the Board of Public Utilities and any other State agencies, as appropriate, shall prepare a report recommending the measures necessary to reduce greenhouse gas emissions, including short-lived climate pollutants, to achieve the [2050] 2055 limit. The report shall include specific recommendations for legislative and regulatory action that will be necessary to achieve the [2050] 2055 limit and any established interim benchmarks. The report shall also include recommendations for additional policies and measures that will be required if the State is otherwise expected to exceed the 2020 limit and any additional measures that will be required to meet the [2050] 2055 limit. The report shall be transmitted to the Governor, to the State Treasurer, to the Legislature pursuant to section 2 of P.L.1991, c.164 (C.52:14-19.1) and to the members of the Senate Environment Committee and the Assembly Environment and Solid Waste Committee.
d. The Energy Master Plan Committee shall include in its adoption of the first update of the energy master plan completed after the date of enactment of P.L.2007, c.112 (C.26:2C-37 et al.), a list of recommended policies and measures to reduce the emission of greenhouse gases from the production, processing, distribution, transmission, storage, or use of energy that will contribute to achieving the 2020 limit.
e. Nothing in P.L.2007, c.112 (C.26:2C-37 et al.) shall impose any limit on the existing authority of the department, the Board of Public Utilities, or any other State department or agency to limit or regulate greenhouse gas emissions pursuant to law.
(cf: P.L.2019, c.197, s.4.)
6. Section 7 of P.L.2007, c.112 (C.26:2C-43) is amended to read as follows:
7. a. No later than 18 months after the effective date of P.L.2019, c.197, and biennially thereafter, the department shall prepare and transmit, in writing, a report to the Governor, to the State Treasurer, to the Legislature pursuant to section 2 of P.L.1991, c.164 (C.52:14-19.1) and to the members of the Senate Environment Committee and the Assembly Environment and Solid Waste Committee, on the status of the greenhouse gas emissions monitoring and reporting program established pursuant to P.L.2007, c.112 (C.26:2C-37 et al.), the current level of greenhouse gas emissions in the State and the progress made toward compliance with the 2020 limit and the [2050] 2055 limit established pursuant to P.L.2007, c.112 (C.26:2C-37 et al.). The report shall also include updated and comparative inventories of Statewide greenhouse gas emissions.
b. As part of the reports required pursuant to subsection a. of this section, the department shall evaluate the ecological, economic, and environmental factors and the technological capability affecting the attainment or maintenance of the 2020 limit and the [2050] 2055 limit established pursuant to this act.
(cf: P.L.2019, c.197, s.5)
7. Section 8 of P.L.2007, c.340 (C.26:2C-52) is amended to read as follows:
8. a. Within one year after the date of enactment of P.L.2007, c.340 (C.26:2C-45 et al.), the department, in consultation with the New Jersey Economic Development Authority and the board, shall adopt, in accordance with the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), guidelines and a priority ranking system to be used to assist in annually allocating funds to eligible projects or programs pursuant to subsection b. of section 7 of P.L.2007, c.340 (C.26:2C-51).
b. The guidelines and the priority ranking system developed pursuant to this section for selecting projects or programs to be awarded grants or other forms of financial assistance from the fund shall include but need not be limited to an evaluation of each eligible project or program as to its predicted ability to:
(1) result in a net reduction in greenhouse gas emissions in the State or in greenhouse gas emissions from electricity produced out of the State but consumed in the State or net sequestration of carbon;
(2) result in significant reductions in greenhouse gases relative to the cost of the project or program and the reduction of impacts on ratepayers attributable to the implementation of P.L.2007, c.340 (C.26:2C-45 et al.), and the ability of the project or program to significantly contribute to achievement of the State's 2020 limit and [2050] 2055 limit established pursuant to the "Global Warming Response Act," P.L.2007, c.112 (C.26:2C-37 et al.), relative to the cost of the project or program;
(3) reduce energy use;
(4) provide co-benefits to the State, including but not limited to creating job opportunities, reducing other air pollutants, reducing costs to electricity and natural gas consumers, improving local electric system reliability, and contributing to regional initiatives to reduce greenhouse gas emissions; and
(5) be directly responsive to the recommendations when submitted by the department to the Legislature pursuant to section 6 of the "Global Warming Response Act," P.L.2007, c.112 (C.26:2C-42).
c. In addition to the criteria set forth in subsection b. of this section, the guidelines and the priority ranking system developed pursuant to this section for selecting projects or programs to be awarded grants or other forms of financial assistance from the fund shall include factors to ensure that grants or other forms of financial assistance from the fund are allocated to projects or programs that will serve communities that are disproportionality impacted by the effects of environmental degradation and climate change, and alleviate the negative effects on human health and the environment resulting therefrom.
(cf: P.L.2019, c.328, s.3.)
8. Section 38 of P.L.1999, c.23 (C.48:3-87) is amended to read as follows:
38. a. The board shall require an electric power supplier or basic generation service provider to disclose on a customer's bill or on customer contracts or marketing materials, a uniform, common set of information about the environmental characteristics of the energy purchased by the customer, including, but not limited to:
(1) Its fuel mix, including categories for oil, gas, nuclear, coal, solar, hydroelectric, wind and biomass, or a regional average determined by the board;
(2) Its emissions, in pounds per megawatt hour, of sulfur dioxide, carbon dioxide, oxides of nitrogen, and any other pollutant that the board may determine to pose an environmental or health hazard, or an emissions default to be determined by the board; and
(3) Any discrete emission reduction retired pursuant to rules and regulations adopted pursuant to P.L.1995, c.188.
b. Notwithstanding any provisions of the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.) to the contrary, the board shall initiate a proceeding and shall adopt, in consultation with the Department of Environmental Protection, after notice and opportunity for public comment and public hearing, interim standards to implement this disclosure requirement, including, but not limited to:
(1) A methodology for disclosure of emissions based on output pounds per megawatt hour;
(2) Benchmarks for all suppliers and basic generation service providers to use in disclosing emissions that will enable consumers to perform a meaningful comparison with a supplier's or basic generation service provider's emission levels; and
(3) A uniform emissions disclosure format that is graphic in nature and easily understandable by consumers. The board shall periodically review the disclosure requirements to determine if revisions to the environmental disclosure system as implemented are necessary.
Such standards shall be effective as regulations immediately upon filing with the Office of Administrative Law and shall be effective for a period not to exceed 18 months, and may, thereafter, be amended, adopted or readopted by the board in accordance with the provisions of the "Administrative Procedure Act."
c. (1) The board may adopt, in consultation with the Department of Environmental Protection, after notice and opportunity for public comment, an emissions portfolio standard applicable to all electric power suppliers and basic generation service providers, upon a finding that:
(a) The standard is necessary as part of a plan to enable the State to meet federal Clean Air Act or State ambient air quality standards; and
(b) Actions at the regional or federal level cannot reasonably be expected to achieve the compliance with the federal standards.
(2) By July 1, 2009, the board shall adopt, pursuant to the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), a greenhouse gas emissions portfolio standard to mitigate leakage or another regulatory mechanism to mitigate leakage applicable to all electric power suppliers and basic generation service providers that provide electricity to customers within the State. The greenhouse gas emissions portfolio standard or any other regulatory mechanism to mitigate leakage shall:
(a) Allow a transition period, either before or after the effective date of the regulation to mitigate leakage, for a basic generation service provider or electric power supplier to either meet the emissions portfolio standard or other regulatory mechanism to mitigate leakage, or to transfer any customer to a basic generation service provider or electric power supplier that meets the emissions portfolio standard or other regulatory mechanism to mitigate leakage. If the transition period allowed pursuant to this subparagraph occurs after the implementation of an emissions portfolio standard or other regulatory mechanism to mitigate leakage, the transition period shall be no longer than three years; and
(b) Exempt the provision of basic generation service pursuant to a basic generation service purchase and sale agreement effective prior to the date of the regulation.
Unless the Attorney General or the Attorney General's designee determines that a greenhouse gas emissions portfolio standard would unconstitutionally burden interstate commerce or would be preempted by federal law, the adoption by the board of an electric energy efficiency portfolio standard pursuant to subsection g. of this section, a gas energy efficiency portfolio standard pursuant to subsection h. of this section, or any other enhanced energy efficiency policies to mitigate leakage shall not be considered sufficient to fulfill the requirement of this subsection for the adoption of a greenhouse gas emissions portfolio standard or any other regulatory mechanism to mitigate leakage.
d. Notwithstanding any provisions of the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.) to the contrary, the board shall initiate a proceeding and shall adopt, after notice, provision of the opportunity for comment, and public hearing, renewable energy portfolio standards that shall require:
(1) that two and one-half percent of the kilowatt hours sold in this State by each electric power supplier and each basic generation service provider be from Class II renewable energy sources;
(2) beginning on January 1, 2020, that 21 percent of the kilowatt hours sold in this State by each electric power supplier and each basic generation service provider be from Class I renewable energy sources. The board shall increase the required percentage for Class I renewable energy sources so that by January 1, 2025, 35 percent of the kilowatt hours sold in this State by each electric power supplier and each basic generation service provider shall be from Class I renewable energy sources, and by January 1, [2030] 2035 , 50 percent of the kilowatt hours sold in this State by each electric power supplier and each basic generation service provider shall be from Class I renewable energy sources. Notwithstanding the requirements of this subsection, the board shall ensure that the cost to customers of the Class I renewable energy requirement imposed pursuant to this subsection shall not exceed nine percent of the total paid for electricity by all customers in the State for energy year 2019, energy year 2020, and energy year 2021, respectively, and shall not exceed seven percent of the total paid for electricity by all customers in the State in any energy year thereafter; provided that, if in energy years 2019 through 2021 the cost to customers of the Class I renewable energy requirement is less than nine percent of the total paid for electricity by all customers in the State, the board may increase the cost to customers of the Class I renewable energy requirement in energy years 2022 through 2024 to a rate greater than seven percent, as long as the total costs to customers for energy years 2019 through 2024 does not exceed the sum of nine percent of the total paid for electricity by all customers in the State in energy years 2019 through 2021 and seven percent of the total paid for electricity by all customers in the State in energy years 2022 through 2024. In calculating the cost to customers of the Class I renewable energy requirement imposed pursuant to this subsection, the board shall not include the costs of the offshore wind energy certificate program established pursuant to paragraph (4) of this subsection. In calculating the cost to customers of the Class I renewable energy requirement, the board shall reflect any energy and environmental savings attributable to the Class I program in its calculation, which shall include, but not be limited to, the social cost of carbon dioxide emissions at a value no less than the most recently published three percent discount rate scenario of the United States Government Interagency Working Group on Social Cost of Greenhouse Gases. The board shall take any steps necessary to prevent the exceedance of the cap on the cost to customers including, but not limited to, adjusting the Class I renewable energy requirement.
An electric power supplier or basic generation service provider may satisfy the requirements of this subsection by participating in a renewable energy trading program approved by the board in consultation with the Department of Environmental Protection;
(3) that the board establish a multi-year schedule, applicable to each electric power supplier or basic generation service provider in this State, beginning with the one-year period commencing on June 1, 2010, and continuing for each subsequent one-year period up to and including, the one-year period commencing on June 1, 2033, that requires the following number or percentage, as the case may be, of kilowatt-hours sold in this State by each electric power supplier and each basic generation service provider to be from solar electric power generators connected to the distribution system or transmission system in this State:
EY 2011 306 Gigawatthours (Gwhrs)
EY 2012 442 Gwhrs
EY 2013 596 Gwhrs
EY 2014 2.050%
EY 2015 2.450%
EY 2016 2.750%
EY 2017 3.000%
EY 2018 3.200%
EY 2019 4.300%
EY 2020 4.900%
EY 2021 5.100%
EY 2022 5.100%
EY 2023 5.100%
EY 2024 4.900%
EY 2025 4.800%
EY 2026 4.500%
EY 2027 4.350%
EY 2028 3.740%
EY 2029 3.070%
EY 2030 2.210%
EY 2031 1.580%
EY 2032 1.400%
EY 2033 1.100%
No later than 180 days after the date of enactment of P.L.2018, c.17 (C.48:3-87.8 et al.), the board shall adopt rules and regulations to close the SREC program to new applications upon the attainment of 5.1 percent of the kilowatt-hours sold in the State by each electric power supplier and each basic generation provider from solar electric power generators connected to the distribution system. The board shall continue to consider any application filed before the date of enactment of P.L.2018, c.17 (C.48:3-87.8 et al.). The board shall provide for an orderly and transparent mechanism that will result in the closing of the existing SREC program on a date certain but no later than June 1, 2021.
No later than 24 months after the date of enactment of P.L.2018, c.17 (C.48:3-87.8 et al.), the board shall complete a study that evaluates how to modify or replace the SREC program to encourage the continued efficient and orderly development of solar renewable energy generating sources throughout the State. The board shall submit the written report thereon to the Governor and, pursuant to section 2 of P.L.1991, c.164 (C.52:14-19.1), to the Legislature. The board shall consult with public utilities, industry experts, regional grid operators, solar power providers and financiers, and other State agencies to determine whether the board can modify the SREC program such that the program will:
- continually reduce, where feasible, the cost of achieving the solar energy goals set forth in this subsection;
- provide an orderly transition from the SREC program to a new or modified program;
- develop megawatt targets for grid connected and distribution systems, including residential and small commercial rooftop systems, community solar systems, and large scale behind the meter systems, as a share of the overall solar energy requirement, which targets the board may modify periodically based on the cost, feasibility, or social impacts of different types of projects;
- establish and update market-based maximum incentive payment caps periodically for each of the above categories of solar electric power generation facilities;
- encourage and facilitate market-based cost recovery through long-term contracts and energy market sales; and
- where cost recovery is needed for any portion of an efficient solar electric power generation facility when costs are not recoverable through wholesale market sales and direct payments from customers, utilize competitive processes such as competitive procurement and long-term contracts where possible to ensure such recovery, without exceeding the maximum incentive payment cap for that category of facility.
The board shall approve, conditionally approve, or disapprove any application for designation as connected to the distribution system of a solar electric power generation facility filed with the board after the date of enactment of P.L.2018, c.17 (C.48:3-87.8 et al.), no more than 90 days after receipt by the board of a completed application. For any such application for a project greater than 25 kilowatts, the board shall require the applicant to post a notice escrow with the board in an amount of $40 per kilowatt of DC nameplate capacity of the facility, not to exceed $40,000. The notice escrow amount shall be reimbursed to the applicant in full upon either denial of the application by the board or upon commencement of commercial operation of the solar electric power generation facility. The escrow amount shall be forfeited to the State if the facility is designated as connected to the distribution system pursuant to this subsection but does not commence commercial operation within two years following the date of the designation by the board.
For all applications for designation as connected to the distribution system of a solar electric power generation facility filed with the board after the date of enactment of P.L.2018, c.17 (C.48:3-87.8 et al.), the SREC term shall be 10 years.
(a) The board shall determine an appropriate period of no less than 120 days following the end of an energy year prior to which a provider or supplier must demonstrate compliance for that energy year with the annual renewable portfolio standard;
(b) No more than 24 months following the date of enactment of P.L.2012, c.24, the board shall complete a proceeding to investigate approaches to mitigate solar development volatility and prepare and submit, pursuant to section 2 of P.L.1991, c.164 (C.52:14-19.1), a report to the Legislature, detailing its findings and recommendations. As part of the proceeding, the board shall evaluate other techniques used nationally and internationally;
(c) The solar renewable portfolio standards requirements in this paragraph shall exempt those existing supply contracts which are effective prior to the date of enactment of P.L.2018, c.17 (C.48:3-87.8 et al.) from any increase beyond the number of SRECs mandated by the solar renewable energy portfolio standards requirements that were in effect on the date that the providers executed their existing supply contracts. This limited exemption for providers' existing supply contracts shall not be construed to lower the Statewide solar sourcing requirements set forth in this paragraph. Such incremental requirements that would have otherwise been imposed on exempt providers shall be distributed over the providers not subject to the existing supply contract exemption until such time as existing supply contracts expire and all providers are subject to the new requirement in a manner that is competitively neutral among all providers and suppliers. Notwithstanding any rule or regulation to the contrary, the board shall recognize these new solar purchase obligations as a change required by operation of law and implement the provisions of this subsection in a manner so as to prevent any subsidies between suppliers and providers and to promote competition in the electricity supply industry.
An electric power supplier or basic generation service provider may satisfy the requirements of this subsection by participating in a renewable energy trading program approved by the board in consultation with the Department of Environmental Protection, or compliance with the requirements of this subsection may be demonstrated to the board by suppliers or providers through the purchase of SRECs.
The renewable energy portfolio standards adopted by the board pursuant to paragraphs (1) and (2) of this subsection shall be effective as regulations immediately upon filing with the Office of Administrative Law and shall be effective for a period not to exceed 18 months, and may, thereafter, be amended, adopted or readopted by the board in accordance with the provisions of the "Administrative Procedure Act."
The renewable energy portfolio standards adopted by the board pursuant to this paragraph shall be effective as regulations immediately upon filing with the Office of Administrative Law and shall be effective for a period not to exceed 30 months after such filing, and shall, thereafter, be amended, adopted or readopted by the board in accordance with the "Administrative Procedure Act"; and
(4) within 180 days after the date of enactment of P.L.2010, c.57 (C.48:3-87.1 et al.), that the board establish an offshore wind renewable energy certificate program to require that a percentage of the kilowatt hours sold in this State by each electric power supplier and each basic generation service provider be from offshore wind energy in order to support at least 3,500 megawatts of generation from qualified offshore wind projects.
The percentage established by the board pursuant to this paragraph shall serve as an offset to the renewable energy portfolio standard established pursuant to paragraph (2) of this subsection and shall reduce the corresponding Class I renewable energy requirement.
The percentage established by the board pursuant to this paragraph shall reflect the projected OREC production of each qualified offshore wind project, approved by the board pursuant to section 3 of P.L.2010, c.57 (C.48:3-87.1), for 20 years from the commercial operation start date of the qualified offshore wind project which production projection and OREC purchase requirement, once approved by the board, shall not be subject to reduction.
An electric power supplier or basic generation service provider shall comply with the OREC program established pursuant to this paragraph through the purchase of offshore wind renewable energy certificates at a price and for the time period required by the board. In the event there are insufficient offshore wind renewable energy certificates available, the electric power supplier or basic generation service provider shall pay an offshore wind alternative compliance payment established by the board. Any offshore wind alternative compliance payments collected shall be refunded directly to the ratepayers by the electric public utilities.
The rules established by the board pursuant to this paragraph shall be effective as regulations immediately upon filing with the Office of Administrative Law and shall be effective for a period not to exceed 18 months, and may, thereafter, be amended, adopted or readopted by the board in accordance with the provisions of the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.).
e. Notwithstanding any provisions of the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.) to the contrary, the board shall initiate a proceeding and shall adopt, after notice, provision of the opportunity for comment, and public hearing:
(1) net metering standards for electric power suppliers and basic generation service providers. The standards shall require electric power suppliers and basic generation service providers to offer net metering at non-discriminatory rates to industrial, large commercial, residential and small commercial customers, as those customers are classified or defined by the board, that generate electricity, on the customer's side of the meter, using a Class I renewable energy source, for the net amount of electricity supplied by the electric power supplier or basic generation service provider over an annualized period. Systems of any sized capacity, as measured in watts, are eligible for net metering. If the amount of electricity generated by the customer-generator, plus any kilowatt hour credits held over from the previous billing periods, exceeds the electricity supplied by the electric power supplier or basic generation service provider, then the electric power supplier or basic generation service provider, as the case may be, shall credit the customer-generator for the excess kilowatt hours until the end of the annualized period at which point the customer-generator will be compensated for any remaining credits or, if the customer-generator chooses, credit the customer-generator on a real-time basis, at the electric power supplier's or basic generation service provider's avoided cost of wholesale power or the PJM electric power pool's real-time locational marginal pricing rate, adjusted for losses, for the respective zone in the PJM electric power pool. Alternatively, the customer-generator may execute a bilateral agreement with an electric power supplier or basic generation service provider for the sale and purchase of the customer-generator's excess generation. The customer-generator may be credited on a real-time basis, so long as the customer-generator follows applicable rules prescribed by the PJM electric power pool for its capacity requirements for the net amount of electricity supplied by the electric power supplier or basic generation service provider. The board may authorize an electric power supplier or basic generation service provider to cease offering net metering to customers that are not already net metered whenever the total rated generating capacity owned and operated by net metering customer-generators Statewide equals 5.8 percent of the total annual kilowatt-hours sold in this State by each electric power supplier and each basic generation service provider during the prior one-year period;
(2) safety and power quality interconnection standards for Class I renewable energy source systems used by a customer-generator that shall be eligible for net metering.
Such standards or rules shall take into consideration the goals of the New Jersey Energy Master Plan, applicable industry standards, and the standards of other states and the Institute of Electrical and Electronics Engineers. The board shall allow electric public utilities to recover the costs of any new net meters, upgraded net meters, system reinforcements or upgrades, and interconnection costs through either their regulated rates or from the net metering customer-generator;
(3) credit or other incentive rules for generators using Class I renewable energy generation systems that connect to New Jersey's electric public utilities' distribution system but who do not net meter; and
(4) net metering aggregation standards to require electric public utilities to provide net metering aggregation to single electric public utility customers that operate a solar electric power generation system installed at one of the customer's facilities or on property owned by the customer, provided that any such customer is a State entity, school district, county, county agency, county authority, municipality, municipal agency, or municipal authority. The standards shall provide that, in order to qualify for net metering aggregation, the customer must operate a solar electric power generation system using a net metering billing account, which system is located on property owned by the customer, provided that: (a) the property is not land that has been actively devoted to agricultural or horticultural use and that is valued, assessed, and taxed pursuant to the "Farmland Assessment Act of 1964," P.L.1964, c.48 (C.54:4-23.1 et seq.) at any time within the 10-year period prior to the effective date of P.L.2012, c.24, provided, however, that the municipal planning board of a municipality in which a solar electric power generation system is located may waive the requirement of this subparagraph (a), (b) the system is not an on-site generation facility, (c) all of the facilities of the single customer combined for the purpose of net metering aggregation are facilities owned or operated by the single customer and are located within its territorial jurisdiction except that all of the facilities of a State entity engaged in net metering aggregation shall be located within five miles of one another, and (d) all of those facilities are within the service territory of a single electric public utility and are all served by the same basic generation service provider or by the same electric power supplier. The standards shall provide that, in order to qualify for net metering aggregation, the customer's solar electric power generation system shall be sized so that its annual generation does not exceed the combined metered annual energy usage of the qualified customer facilities, and the qualified customer facilities shall all be in the same customer rate class under the applicable electric public utility tariff. For the customer's facility or property on which the solar electric generation system is installed, the electricity generated from the customer's solar electric generation system shall be accounted for pursuant to the provisions of paragraph (1) of this subsection to provide that the electricity generated in excess of the electricity supplied by the electric power supplier or the basic generation service provider, as the case may be, for the customer's facility on which the solar electric generation system is installed, over the annualized period, is credited at the electric power supplier's or the basic generation service provider's avoided cost of wholesale power or the PJM electric power pool real-time locational marginal pricing rate. All electricity used by the customer's qualified facilities, with the exception of the facility or property on which the solar electric power generation system is installed, shall be billed at the full retail rate pursuant to the electric public utility tariff applicable to the customer class of the customer using the electricity. A customer may contract with a third party to operate a solar electric power generation system, for the purpose of net metering aggregation. Any contractual relationship entered into for operation of a solar electric power generation system related to net metering aggregation shall include contractual protections that provide for adequate performance and provision for construction and operation for the term of the contract, including any appropriate bonding or escrow requirements. Any incremental cost to an electric public utility for net metering aggregation shall be fully and timely recovered in a manner to be determined by the board. The board shall adopt net metering aggregation standards within 270 days after the effective date of P.L.2012, c.24.
Such rules shall require the board or its designee to issue a credit or other incentive to those generators that do not use a net meter but otherwise generate electricity derived from a Class I renewable energy source and to issue an enhanced credit or other incentive, including, but not limited to, a solar renewable energy credit, to those generators that generate electricity derived from solar technologies.
Such standards or rules shall be effective as regulations immediately upon filing with the Office of Administrative Law and shall be effective for a period not to exceed 18 months, and may, thereafter, be amended, adopted or readopted by the board in accordance with the provisions of the "Administrative Procedure Act."
f. The board may assess, by written order and after notice and opportunity for comment, a separate fee to cover the cost of implementing and overseeing an emission disclosure system or emission portfolio standard, which fee shall be assessed based on an electric power supplier's or basic generation service provider's share of the retail electricity supply market. The board shall not impose a fee for the cost of implementing and overseeing a greenhouse gas emissions portfolio standard adopted pursuant to paragraph (2) of subsection c. of this section.
g. The board shall adopt, pursuant to the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), an electric energy efficiency program in order to ensure investment in cost-effective energy efficiency measures, ensure universal access to energy efficiency measures, and serve the needs of low-income communities that shall require each electric public utility to implement energy efficiency measures that reduce electricity usage in the State pursuant to section 3 of P.L.2018, c.17 (C.48:3-87.9). Nothing in this subsection shall be construed to prevent an electric public utility from meeting the requirements of this subsection by contracting with another entity for the performance of the requirements.
h. The board shall adopt, pursuant to the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), a gas energy efficiency program in order to ensure investment in cost-effective energy efficiency measures, ensure universal access to energy efficiency measures, and serve the needs of low-income communities that shall require each gas public utility to implement energy efficiency measures that reduce natural gas usage in the State pursuant to section 3 of P.L.2018, c.17 (C.48:3-87.9). Nothing in this subsection shall be construed to prevent a gas public utility from meeting the requirements of this subsection by contracting with another entity for the performance of the requirements.
i. After the board establishes a schedule of solar kilowatt-hour sale or purchase requirements pursuant to paragraph (3) of subsection d. of this section, the board may initiate subsequent proceedings and adopt, after appropriate notice and opportunity for public comment and public hearing, increased minimum solar kilowatt-hour sale or purchase requirements, provided that the board shall not reduce previously established minimum solar kilowatt-hour sale or purchase requirements, or otherwise impose constraints that reduce the requirements by any means.
j. The board shall determine an appropriate level of solar alternative compliance payment, and permit each supplier or provider to submit an SACP to comply with the solar electric generation requirements of paragraph (3) of subsection d. of this section. The value of the SACP for each Energy Year, for Energy Years 2014 through 2033 per megawatt hour from solar electric generation required pursuant to this section, shall be:
EY 2014 $339
EY 2015 $331
EY 2016 $323
EY 2017 $315
EY 2018 $308
EY 2019 $268
EY 2020 $258
EY 2021 $248
EY 2022 $238
EY 2023 $228
EY 2024 $218
EY 2025 $208
EY 2026 $198
EY 2027 $188
EY 2028 $178
EY 2029 $168
EY 2030 $158
EY 2031 $148
EY 2032 $138
EY 2033 $128.
The board may initiate subsequent proceedings and adopt, after appropriate notice and opportunity for public comment and public hearing, an increase in solar alternative compliance payments, provided that the board shall not reduce previously established levels of solar alternative compliance payments, nor shall the board provide relief from the obligation of payment of the SACP by the electric power suppliers or basic generation service providers in any form. Any SACP payments collected shall be refunded directly to the ratepayers by the electric public utilities.
k. The board may allow electric public utilities to offer long-term contracts through a competitive process, direct electric public utility investment and other means of financing, including but not limited to loans, for the purchase of SRECs and the resale of SRECs to suppliers or providers or others, provided that after such contracts have been approved by the board, the board's approvals shall not be modified by subsequent board orders. If the board allows the offering of contracts pursuant to this subsection, the board may establish a process, after hearing, and opportunity for public comment, to provide that a designated segment of the contracts approved pursuant to this subsection shall be contracts involving solar electric power generation facility projects with a capacity of up to 250 kilowatts.
l. The board shall implement its responsibilities under the provisions of this section in such a manner as to:
(1) place greater reliance on competitive markets, with the explicit goal of encouraging and ensuring the emergence of new entrants that can foster innovations and price competition;
(2) maintain adequate regulatory authority over non-competitive public utility services;
(3) consider alternative forms of regulation in order to address changes in the technology and structure of electric public utilities;
(4) promote energy efficiency and Class I renewable energy market development, taking into consideration environmental benefits and market barriers;
(5) make energy services more affordable for low and moderate income customers;
(6) attempt to transform the renewable energy market into one that can move forward without subsidies from the State or public utilities;
(7) achieve the goals put forth under the renewable energy portfolio standards;
(8) promote the lowest cost to ratepayers; and
(9) allow all market segments to participate.
m. The board shall ensure the availability of financial incentives under its jurisdiction, including, but not limited to, long-term contracts, loans, SRECs, or other financial support, to ensure market diversity, competition, and appropriate coverage across all ratepayer segments, including, but not limited to, residential, commercial, industrial, non-profit, farms, schools, and public entity customers.
n. For projects which are owned, or directly invested in, by a public utility pursuant to section 13 of P.L.2007, c.340 (C.48:3-98.1), the board shall determine the number of SRECs with which such projects shall be credited; and in determining such number the board shall ensure that the market for SRECs does not detrimentally affect the development of non-utility solar projects and shall consider how its determination may impact the ratepayers.
o. The board, in consultation with the Department of Environmental Protection, electric public utilities, the Division of Rate Counsel in, but not of, the Department of the Treasury, affected members of the solar energy industry, and relevant stakeholders, shall periodically consider increasing the renewable energy portfolio standards beyond the minimum amounts set forth in subsection d. of this section, taking into account the cost impacts and public benefits of such increases including, but not limited to:
(1) reductions in air pollution, water pollution, land disturbance, and greenhouse gas emissions;
(2) reductions in peak demand for electricity and natural gas, and the overall impact on the costs to customers of electricity and natural gas;
(3) increases in renewable energy development, manufacturing, investment, and job creation opportunities in this State; and
(4) reductions in State and national dependence on the use of fossil fuels.
p. Class I RECs and ORECs shall be eligible for use in renewable energy portfolio standards compliance in the energy year in which they are generated, and for the following two energy years. SRECs shall be eligible for use in renewable energy portfolio standards compliance in the energy year in which they are generated, and for the following four energy years.
q. (1) During the energy years of 2014, 2015, and 2016, a solar electric power generation facility project that is not: (a) net metered; (b) an on-site generation facility; (c) qualified for net metering aggregation; or (d) certified as being located on a brownfield, on an area of historic fill or on a properly closed sanitary landfill facility, as provided pursuant to subsection t. of this section may file an application with the board for approval of a designation pursuant to this subsection that the facility is connected to the distribution system. An application filed pursuant to this subsection shall include a notice escrow of $40,000 per megawatt of the proposed capacity of the facility. The board shall approve the designation if: the facility has filed a notice in writing with the board applying for designation pursuant to this subsection, together with the notice escrow; and the capacity of the facility, when added to the capacity of other facilities that have been previously approved for designation prior to the facility's filing under this subsection, does not exceed 80 megawatts in the aggregate for each year. The capacity of any one solar electric power supply project approved pursuant to this subsection shall not exceed 10 megawatts. No more than 90 days after its receipt of a completed application for designation pursuant to this subsection, the board shall approve, conditionally approve, or disapprove the application. The notice escrow shall be reimbursed to the facility in full upon either rejection by the board or the facility entering commercial operation, or shall be forfeited to the State if the facility is designated pursuant to this subsection but does not enter commercial operation pursuant to paragraph (2) of this subsection.
(2) If the proposed solar electric power generation facility does not commence commercial operations within two years following the date of the designation by the board pursuant to this subsection, the designation of the facility shall be deemed to be null and void, and the facility shall not be considered connected to the distribution system thereafter.
(3) Notwithstanding the provisions of paragraph (2) of this subsection, a solar electric power generation facility project that as of May 31, 2017 was designated as "connected to the distribution system," but failed to commence commercial operations as of that date, shall maintain that designation if it commences commercial operations by May 31, 2018.
r. (1) For all proposed solar electric power generation facility projects except for those solar electric power generation facility projects approved pursuant to subsection q. of this section, and for all projects proposed in energy year 2019 and energy year 2020, the board may approve projects for up to 50 megawatts annually in auctioned capacity in two auctions per year as long as the board is accepting applications. If the board approves projects for less than 50 megawatts in energy year 2019 or less than 50 megawatts in energy year 2020, the difference in each year shall be carried over into the successive energy year until 100 megawatts of auctioned capacity has been approved by the board pursuant to this subsection. A proposed solar electric power generation facility that is neither net metered nor an on-site generation facility, may be considered "connected to the distribution system" only upon designation as such by the board, after notice to the public and opportunity for public comment or hearing. A proposed solar electric power generation facility seeking board designation as "connected to the distribution system" shall submit an application to the board that includes for the proposed facility: the nameplate capacity; the estimated energy and number of SRECs to be produced and sold per year; the estimated annual rate impact on ratepayers; the estimated capacity of the generator as defined by PJM for sale in the PJM capacity market; the point of interconnection; the total project acreage and location; the current land use designation of the property; the type of solar technology to be used; and such other information as the board shall require.
(2) The board shall approve the designation of the proposed solar electric power generation facility as "connected to the distribution system" if the board determines that:
(a) the SRECs forecasted to be produced by the facility do not have a detrimental impact on the SREC market or on the appropriate development of solar power in the State;
(b) the approval of the designation of the proposed facility would not significantly impact the preservation of open space in this State;
(c) the impact of the designation on electric rates and economic development is beneficial; and
(d) there will be no impingement on the ability of an electric public utility to maintain its property and equipment in such a condition as to enable it to provide safe, adequate, and proper service to each of its customers.
(3) The board shall act within 90 days of its receipt of a completed application for designation of a solar electric power generation facility as "connected to the distribution system," to either approve, conditionally approve, or disapprove the application. If the proposed solar electric power generation facility does not commence commercial operations within two years following the date of the designation by the board pursuant to this subsection, the designation of the facility as "connected to the distribution system" shall be deemed to be null and void, and the facility shall thereafter be considered not "connected to the distribution system."
s. In addition to any other requirements of P.L.1999, c.23 or any other law, rule, regulation or order, a solar electric power generation facility that is not net metered or an on-site generation facility and which is located on land that has been actively devoted to agricultural or horticultural use that is valued, assessed, and taxed pursuant to the "Farmland Assessment Act of 1964," P.L.1964, c.48 (C.54:4-23.1 et seq.) at any time within the 10-year period prior to the effective date of P.L.2012, c.24, shall only be considered "connected to the distribution system" if (1) the board approves the facility's designation pursuant to subsection q. of this section; or (2) (a) PJM issued a System Impact Study for the facility on or before June 30, 2011, (b) the facility files a notice with the board within 60 days of the effective date of P.L.2012, c.24, indicating its intent to qualify under this subsection, and (c) the facility has been approved as "connected to the distribution system" by the board. Nothing in this subsection shall limit the board's authority concerning the review and oversight of facilities, unless such facilities are exempt from such review as a result of having been approved pursuant to subsection q. of this section.
t. (1) No more than 180 days after the date of enactment of P.L.2012, c.24, the board shall, in consultation with the Department of Environmental Protection and the New Jersey Economic Development Authority, and, after notice and opportunity for public comment and public hearing, complete a proceeding to establish a program to provide SRECs to owners of solar electric power generation facility projects certified by the board, in consultation with the Department of Environmental Protection, as being located on a brownfield, on an area of historic fill or on a properly closed sanitary landfill facility, including those owned or operated by an electric public utility and approved pursuant to section 13 of P.L.2007, c.340 (C.48:3-98.1). Projects certified under this subsection shall be considered "connected to the distribution system", shall not require such designation by the board, and shall not be subject to board review required pursuant to subsections q. and r. of this section. Notwithstanding the provisions of section 3 of P.L.1999, c.23 (C.48:3-51) or any other law, rule, regulation, or order to the contrary, for projects certified under this subsection, the board shall establish a financial incentive that is designed to supplement the SRECs generated by the facility in order to cover the additional cost of constructing and operating a solar electric power generation facility on a brownfield, on an area of historic fill or on a properly closed sanitary landfill facility. Any financial benefit realized in relation to a project owned or operated by an electric public utility and approved by the board pursuant to section 13 of P.L.2007, c.340 (C.48:3-98.1), as a result of the provision of a financial incentive established by the board pursuant to this subsection, shall be credited to ratepayers. The issuance of SRECs for all solar electric power generation facility projects pursuant to this subsection shall be deemed "Board of Public Utilities financial assistance" as provided under section 1 of P.L.2009, c.89 (C.48:2-29.47).
(2) Notwithstanding the provisions of the "Spill Compensation and Control Act," P.L.1976, c.141 (C.58:10-23.11 et seq.) or any other law, rule, regulation, or order to the contrary, the board, in consultation with the Department of Environmental Protection, may find that a person who operates a solar electric power generation facility project that has commenced operation on or after the effective date of P.L.2012, c.24, which project is certified by the board, in consultation with the Department of Environmental Protection pursuant to paragraph (1) of this subsection, as being located on a brownfield for which a final remediation document has been issued, on an area of historic fill or on a properly closed sanitary landfill facility, which projects shall include, but not be limited to projects located on a brownfield for which a final remediation document has been issued, on an area of historic fill or on a properly closed sanitary landfill facility owned or operated by an electric public utility and approved pursuant to section 13 of P.L.2007, c.340 (C.48:3-98.1), or a person who owns property acquired on or after the effective date of P.L.2012, c.24 on which such a solar electric power generation facility project is constructed and operated, shall not be liable for cleanup and removal costs to the Department of Environmental Protection or to any other person for the discharge of a hazardous substance provided that:
(a) the person acquired or leased the real property after the discharge of that hazardous substance at the real property;
(b) the person did not discharge the hazardous substance, is not in any way responsible for the hazardous substance, and is not a successor to the discharger or to any person in any way responsible for the hazardous substance or to anyone liable for cleanup and removal costs pursuant to section 8 of P.L.1976, c.141 (C.58:10-23.11g);
(c) the person, within 30 days after acquisition of the property, gave notice of the discharge to the Department of Environmental Protection in a manner the Department of Environmental Protection prescribes;
(d) the person does not disrupt or change, without prior written permission from the Department of Environmental Protection, any engineering or institutional control that is part of a remedial action for the contaminated site or any landfill closure or post-closure requirement;
(e) the person does not exacerbate the contamination at the property;
(f) the person does not interfere with any necessary remediation of the property;
(g) the person complies with any regulations and any permit the Department of Environmental Protection issues pursuant to section 19 of P.L.2009, c.60 (C.58:10C-19) or paragraph (2) of subsection a. of section 6 of P.L.1970, c.39 (C.13:1E-6);
(h) with respect to an area of historic fill, the person has demonstrated pursuant to a preliminary assessment and site investigation, that hazardous substances have not been discharged; and
(i) with respect to a properly closed sanitary landfill facility, no person who owns or controls the facility receives, has received, or will receive, with respect to such facility, any funds from any post-closure escrow account established pursuant to section 10 of P.L.1981, c.306 (C.13:1E-109) for the closure and monitoring of the facility.
Only the person who is liable to clean up and remove the contamination pursuant to section 8 of P.L.1976, c.141 (C.58:10-23.11g) and who does not have a defense to liability pursuant to subsection d. of that section shall be liable for cleanup and removal costs.
u. No more than 180 days after the date of enactment of P.L.2012, c.24, the board shall complete a proceeding to establish a registration program. The registration program shall require the owners of solar electric power generation facility projects connected to the distribution system to make periodic milestone filings with the board in a manner and at such times as determined by the board to provide full disclosure and transparency regarding the overall level of development and construction activity of those projects Statewide.
v. The issuance of SRECs for all solar electric power generation facility projects pursuant to this section, for projects connected to the distribution system with a capacity of one megawatt or greater, shall be deemed "Board of Public Utilities financial assistance" as provided pursuant to section 1 of P.L.2009, c.89 (C.48:2-29.47).
w. No more than 270 days after the date of enactment of P.L.2012, c.24, the board shall, after notice and opportunity for public comment and public hearing, complete a proceeding to consider whether to establish a program to provide, to owners of solar electric power generation facility projects certified by the board as being three megawatts or greater in capacity and being net metered, including facilities which are owned or operated by an electric public utility and approved by the board pursuant to section 13 of P.L.2007, c.340 (C.48:3-98.1), a financial incentive that is designed to supplement the SRECs generated by the facility to further the goal of improving the economic competitiveness of commercial and industrial customers taking power from such projects. If the board determines to establish such a program pursuant to this subsection, the board may establish a financial incentive to provide that the board shall issue one SREC for no less than every 750 kilowatt-hours of solar energy generated by the certified projects. Any financial benefit realized in relation to a project owned or operated by an electric public utility and approved by the board pursuant to section 13 of P.L.2007, c.340 (C.48:3-98.1), as a result of the provisions of a financial incentive established by the board pursuant to this subsection, shall be credited to ratepayers.
x. Solar electric power generation facility projects that are located on an existing or proposed commercial, retail, industrial, municipal, professional, recreational, transit, commuter, entertainment complex, multi-use, or mixed-use parking lot with a capacity to park 350 or more vehicles where the area to be utilized for the facility is paved, or an impervious surface may be owned or operated by an electric public utility and may be approved by the board pursuant to section 13 of P.L.2007, c.340 (C.48:3-98.1).
(cf: P.L.2021, c.169, s.10)
9. Section 1 of P.L.2018, c.17 (C.48:3-87.8) is amended to read as follows:
1. a. No later than one year after the date of enactment of P.L.2018, c.17 (C.48:3-87.8 et al.), the Board of Public Utilities, in consultation with PJM Interconnection, L.L.C., the independent system operator, shall, together with stakeholders including but not limited to third party suppliers and electric public utilities, conduct an energy storage analysis and submit a written report to the Governor and, pursuant to section 2 of P.L.1991, c.164 (C.52:14-19.1), to the Legislature concerning energy storage needs and opportunities in the State. In conducting this analysis, the board shall:
(1) consider how implementation of renewable electric energy storage systems may benefit ratepayers by providing emergency back-up power for essential services, offsetting peak loads, and stabilizing the electric distribution system;
(2) consider whether implementation of renewable electric energy storage systems would promote the use of electric vehicles in the State, and the potential impact on renewable energy production in the State;
(3) study the types of energy storage technologies currently being implemented in the State and elsewhere;
(4) consider the benefits and costs to ratepayers, local governments, and electric public utilities associated with the development and implementation of additional energy storage technologies;
(5) determine the optimal amount of energy storage to be added in the State over the next five years in order to provide the maximum benefit to ratepayers;
(6) determine the optimum points of entry into the electric distribution system for distributed energy resources; and
(7) calculate the cost to the State's ratepayers of adding the optimal amount of energy storage.
In conducting the analysis required by this subsection, the board shall also consider the need for integration of distributed energy resources into the electric distribution system and how distributed energy resources may be incorporated into the electric distribution system in the most efficient and cost-effective manner.
b. In conducting the energy storage analysis required by this section, the board shall consult with the Laboratory for Energy Smart Systems in the Center for Advanced Infrastructure and Transportation at Rutgers, The State University, and public and private entities in the State and in other states that have conducted studies concerning, or are implementing technologies for, energy storage and distributed energy resources.
c. The written report shall: (1) summarize the analysis conducted pursuant to subsection a. of this section; (2) discuss and quantify the potential benefits and costs associated with increasing opportunities for energy storage and distributed energy resources in the State; and (3) recommend ways to increase opportunities for energy storage and distributed energy resources in the State, including any recommendations for financial incentives to aid in the development and implementation of these technologies by public and private entities in the State.
d. No later than six months after completion of the report, the board shall initiate a proceeding to establish a process and mechanism for achieving the goal of 600 megawatts of energy storage by 2021 and 2,000 megawatts of energy storage by [2030] 2035.
(cf: P.L.2018, c.17, s.1.)
10. This act shall take effect immediately.
STATEMENT
This bill delays for five years, from 2050 to 2055, the date the State is required to reduce greenhouse gas emissions to 80 percent below 2006 levels, as required pursuant to the “Global Warming Response Act,” P.L.2007, c.112 (26:2C-37 et seq.). The bill also delays for five years, from 2030 to 2035, the date that 35 percent of the kilowatt hours sold in the State by each electric power supplier and each basic generation service provider is required to be from Class I renewable sources. Finally, the bill would also delay, from 2030 to 2035, the date by which the State is required to achieve the goal of 2,000 megawatts of energy storage, pursuant to P.L.2018, c.17 (C.48:3-87.8 et al.).
The deadlines mandated by current law are unattainable given the current energy production and use status in the State. To attempt to comply will lead to either harmful life-altering decreases in energy use or equally harmful increases in energy prices. New Jersey residents are beginning to feel the impact of 20 percent increases in energy costs due in part to these pending deadlines. The rationing of energy by price on our citizens is not the proper solution and care must be taken to regain the balance of energy production, use, and conservation that is needed to keep costs affordable. This bill gives the State time to achieve this balance.